Asset register
Record supported equipment by site, manufacturer, model, serial number and condition.
Consistent support across several locations
Norgroup can develop structured equipment-maintenance arrangements for suitable groups and multi-site operators, combining asset information, planned visits, fault support, reporting and configurable repair-authorisation controls.
Coverage, assets, attendance allowances, travel and commercial terms are defined in the individual proposal and signed agreement.
Manage more than individual call-outs
Multi-site operators can lose visibility when equipment information, service history and repair approvals are held differently at each location. This makes it harder to identify recurring failures, prioritise replacements and control maintenance expenditure.
A structured Norgroup arrangement can establish supported asset lists, site contacts, attendance rules, reporting expectations and authorisation limits before individual faults arise.
Programme components
The final programme is tailored to the number of sites, assets, condition and support level required.
Record supported equipment by site, manufacturer, model, serial number and condition.
Confirm contacts, access, opening hours, inductions and local operational restrictions.
Schedule suitable preventative maintenance and inspections across the estate.
Define the annual support allowance and standard process for reporting equipment faults.
Set pre-authorised spending limits by fault, attendance, asset, site or agreement.
Provide suitable records of findings, work, recommendations and developing priorities.
Multi-site controls
Clear rules reduce delays while preserving control over expenditure and non-routine work.
Route work above agreed thresholds to a nominated head-office contact.
Allow authorised site contacts to approve suitable minor work within defined limits.
Identify poor-condition, unsupported or pre-existing faulted equipment separately.
Apply suitable overall or site-specific expenditure controls where agreed.
Identify production-critical machines requiring greater inspection or response planning.
Use service history and condition data to review the next agreement period.
Programme setup
Confirm sites, supported operations, equipment types and existing maintenance arrangements.
Collect equipment identification, condition and known fault information.
Agree planned work, attendance allowances, service hours, approvals and reporting.
Plan suitable site audits and preventative maintenance around operations.
Use the agreed process for attendance, authorisation and follow-up work.
Assess service history, recurring faults, exclusions and replacement priorities before renewal.
Commercial control
Different groups require different balances between rapid local decisions and central control. The proposal can define who approves what and at which level.
Multi-asset example: Danish Bakery
Norgroup supports four Lillnord KR 345-255 prover units for Danish Bakery, providing asset-specific technical knowledge and a consistent route for maintenance and fault support.
The example shows how several related production assets can be recorded and maintained as a managed equipment group rather than unrelated individual call-outs.
Managing several sites or asset groups?
Norgroup can review the estate and propose an appropriate audit, maintenance and reporting structure.
Frequently asked questions
There is no fixed public minimum. Suitability depends on the number and type of assets, locations, support requirements and commercial value of the proposed programme.
Yes, suitable supported bakery and catering equipment can be grouped within the programme, subject to audit and agreed exclusions.
Yes. Supported equipment can be considered regardless of original supplier, but pre-existing faults and poor-condition assets may be excluded or quoted separately.
Yes. Suitable approval controls can be configured by fault, attendance, asset, site or the agreement as a whole.
Parts, consumables and wear items are not automatically included unless the proposal expressly states otherwise.
Suitable national arrangements can be assessed. Coverage, travel, engineer availability and any specialist partner requirements are defined in the proposal.
Emergency or out-of-hours attendance is not guaranteed unless expressly included in the signed agreement.
Provide the site list, asset information, operating hours, existing service arrangements, priorities and desired approval structure.
Request a multi-site proposal
Norgroup can recommend an audit and service-agreement structure for suitable estates.